Explore proven agent use cases by industry or function. Run them on EnterpriseOS, or let Deccan operate them with you.
Get one reconciled view of what's actually running across every plant
Continuously reconcile the MES-published schedule against actual line execution across your plants, flag drift, and auto-resolve low-risk rescheduling exceptions.
Know whether a corrective action actually held
Link each production-line non-conformance to its disposition and corrective action, and automatically check subsequent production runs for recurrence.
Triage control-chart alarms before scrap accumulates
Classify SPC out-of-control signals as a true process shift or a measurement artifact using historical pattern context, and pre-draft the investigation note for your quality engineer.
Catch a supplier's quality slipping before the next stoppage
Aggregate incoming-inspection results and corrective-action history per supplier, flag emerging defect-rate degradation before it triggers a quality hold, and draft the corrective-action narrative.
Dispatch the right technician the moment a line goes down
Cross-reference a new breakdown ticket against equipment history, spare-parts inventory, and technician skill and availability, and recommend priority and assignment in seconds.
See what an engineering change really touches
Cross-reference a pending engineering change against open work orders, inventory, and purchase orders, and recommend a safe effectivity date before it ships.
Stop losing OEE detail to inconsistent downtime codes
Suggest a consistent downtime and loss reason at the point of entry, and surface the chronic small losses that don't show up as a single discrete event.
Re-plan around capacity and material surprises before Wednesday
Monitor MRP-generated planned orders against real-time capacity and material-availability signals, and draft a re-sequenced plan with customer due-date impacts flagged for review.
Connect the yard schedule to what the line actually needs
Monitor incoming trailer ETAs and dock schedules against the production schedule's material-need dates, and flag when an inbound lot is at risk of missing its production window.