Generate, schedule, and track recurring preventive maintenance work orders on calendar or usage intervals, and flag when a PM is at risk of being deferred past its window.
PM scheduling is mature software, but adjusting intervals for observed wear, deciding when to defer a PM around a production-critical run, and verifying completion quality still take manual attention every week.
Without that attention, PMs slip quietly and the plan stops matching what the equipment actually needs.
on calendar or usage intervals
Adjust intervals and deferrals
PM-5502 on the Line 3 stamping press is due in 4 days, right in the middle of a customer-critical run the plant scheduled last week. This is the second deferral request on this asset this quarter.
Try it — same review surface your operators use, with a representative decision. Nothing here is saved or sent anywhere.
Adjusting PM intervals based on observed wear, deciding when to defer a PM around a production-critical run, and verifying completion quality, stay with your maintenance team.
See this workflow against your own queue.